If you have decided on KNX, the detailed design is the first step, not a formality. It tells your electrician how many circuits to run back to the distribution board, where the bus cable goes and how large the enclosure has to be. Without it the installation gets built as a conventional one, and KNX cannot be added on top of that later.

Ask for a design quote

What the KNX design contains

01

Circuits assigned to devices

Every controlled circuit mapped to a specific channel on a specific actuator, with spare capacity for later additions.

02

Device selection

Switching, blind, dimming and heating actuators chosen against the real circuit count, not against a catalogue.

03

Bus power supply

Sized from the calculated current draw of every device on the line, with the headroom worked out.

04

Bus routing

A separate loop per floor, leaving the distribution board and returning to it, with the far end left unterminated as a spare.

05

Device schedule

A full list of equipment for the board with the module count and the required enclosure size. A KNX board is usually several times larger than the one in the electrical design.

06

Cabling specification

Cross-sections, core counts and terminations for every type of point — in a form the electrician works from directly.

Decisions that are made at this stage

The items below are either in the design, or they cost you chased walls later. This is where the document earns its money.

!

Cable to window coverings

Four cores for roller blinds, five for curtain tracks — curtain motors need a permanent live on one core. Get this wrong and the function is simply gone.

!

Number of lighting circuits

With circuit-level control you end up with dozens of circuits instead of a handful. This is the largest change to the electrician’s scope.

!

Size of the distribution board

KNX devices, protection and spare capacity come to well over two hundred modules on an average house.

!

Heating control

Thermoelectric actuators cycle continuously, so they belong on a heating actuator with electronic outputs, never on relays.

Equipment

KNX is an open industrial standard that has been in place since 1990 and is supported by several hundred manufacturers. Choosing hardware is therefore a question of function and price, not of loyalty to one brand. We most often work with:

MDTInterraJUNGGIRAZennioMean Well
The switch range stays your choice — the design sets the functions and the number of keys, not the style of the faceplate.

What the design costs

Pricing starts at PLN 30 net per square metre of floor area, with a minimum fee of PLN 6,000 net. Floor area is only the starting point — the final figure follows the scope. Two houses of the same size can differ twofold in design hours, because what counts is the number of controlled circuits, heating zones, window coverings and technical systems that have to work together. I give an exact price once I have seen the project. The design is documentation handed over to you outright — it ties you to no integrator. Site supervision of the electrician’s work, if you want it, is quoted separately.

Ask for a quote

Frequently asked questions

Is it true that only 64 devices fit on a KNX line?

No. That figure comes from a 640 mA supply assuming 10 mA per device. The real limit is the current capacity of the power supply, and a larger supply moves it. The caution runs the other way too: presence detectors and touch panels draw anywhere from fifteen to thirty mA, so on an installation with many sensors 640 mA runs out well before the sixty-fourth device. That is why the supply is sized from a calculated load rather than from a table.

Can I start with part of the house and add the rest later?

With devices, yes. With cabling, no. Every cable has to go in now, because afterwards it means chasing walls. Equipment in the board, on the other hand, can be added in stages — provided the enclosure was designed with spare capacity from the outset. Lighting is the exception: a circuit run back to the board will not switch on until there is an actuator above it.

Does the design tie me to one contractor?

No. The documentation is complete and legible to any KNX integrator — you place the work with whoever you choose, whenever you choose.

Let us talk about your installation

Tell me what stage the build is at and what scope you have in mind. I will come back with a concrete proposal.

Go to the contact form

or write directly: kontakt@elnext.pl · +48 530 283 277